• The production capacity of Zhuanlongwan coal mine of Ordos energy and Chemical Co., Ltd. has been expanded from 5.0mt/a to 8.0mt/a. The policy requires that coal preparation plants of the same scale must be equipped. In 2015, Shenzhou group built a 3.0mt/a dry process coal preparation plant. After separation, the calorific value of block clean coal increased by 1800kcal / kg and that of final clean coal increased by 1000kcal / kg. The project has the advantages of high product recovery rate, energy conservation and environmental protection.


    ITEM

    yield Wt%

    ASH Ad%

    Qnet,ar,Kcal/kg   NET CALORIFIC VALUE Qnet,ar,Kcal/kg

    RAW COAL

    100

    37.60

    3815

    LUMP CLEAN COAL

    20.90

    6.30

    5691

    FINE CLEAN COAL

    48.60

    18.94

    4887

    REJECT

    30.50

    88.78

    821

    ORDOS ENERGY AND CHEMICAL CO.,LTD OF YANZHOU COAL INDUSTRY

    TIME: 2022-03-07
    FOLLOW WITH OUR WECHAT,?
    TO KNOW MORE ABOUT SHENZHOU GROUP.

    PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

    ONLINE MESSAGE

    长谷川美红